Wersja Polska English Version Deutsche Українська версія Русская версия

Astex Professional  Astex-Term thermal insulation system  Adhesive mortars in the insulation system  Adhesive mortar for embedding mesh and sticking styrofoam boards STYRO LUX Gray 

Styro Lux Gray

Styro Lux gray adhesive mortar is intended for gluing and leveling foamed polystyrene boards and for embedding fiberglass mesh in the reinforced layer of the ASTEX TERM insulation system

  • Frost resistant
  • Vapor permeable
  • Easily machinable
  • High adhesion

Calculate expenditure

Coverage area (m2)
Average consumption for a specific area:
Sticking foamed polystyrene
Mesh embedding


Weight 25 kg
Przyklejanie styropianiu
Zatapianie siatki


Expenditure when gluing foamed polystyrene boards

4,0-5,0 kg/m2

Expenditure on embedding mesh

3,0 -4,0 kg/m2

Shell life

12 months from the date of production

Packaging

25 kg

Number of packages on a pallet

54 pcs

Reference document

European Technical Assessment 17/0726

Application

Adhesive mortar Styro Lux gray is used for gluing foamed polystyrene boards and laying reinforcing mesh in the building insulation system for various types of decorative plasters. The mortar is suitable for filling small cavities of the stabilized substrate, as well as for leveling the surface. Can be used inside and outside buildings.

Substrate preparation

The substrate on which Styro Lux gray adhesive mortar is used can be concrete of all classes, aerated concrete, raw brick wall or light concrete blocks and old stable plaster. The substrate should be dry, stable, even, carrying, i.e. strong enough, cleaned of layers that can weaken mortar adhesion (dust, dirt, oils, fats, wax, oil and emulsion paint residues). Larger bumps and cavities should be filled with putty. Damaged and poorly adhering plasters should be removed. Dusty and excessively absorbent substrates should be primed with UNI-ASTEX primer.

Mortar preparation

The mortar is prepared by pouring it into water and mixing it manually or mechanically until the right consistency is obtained. Mixing proportions: 25 kg of mortar (1 bag) for approx. 5.5 to 6 L of water. The adhesive mortar is ready to work after 10 minutes and after mixing again, and retains its properties for approx. 4 hours. Higher temperatures shorten, while lower temperatures increase mortar readiness time

Gluing foamed boards and arranging the reinforcing mesh

Apply adhesive mortar Styro Lux gray to the inside of the board with a trowel, laying a roller along the perimeter that will form a frame and from 3 to 8 patches on the remaining surface (depending on the size of the board). The amount of adhesive mortar on the board after pressing against the wall should be 50% - 60% of the adhesive surface. 3 days after gluing the foamed polystyrene boards (after the adhesive mortar has set), you can proceed with the fixing plastic expansion dowels. The surface of foamed polystyrene boards should be even, clean, stable and dust-free after sanding in order to make the reinforcing layer of mesh. Before laying the reinforcing mesh, apply adhesive mortar with a notched trowel. Then arrange the reinforcing mesh in vertical stripes, keeping the overlap at least 10 cm, then even the surface.The thickness of the reinforcement layers must be at least 3 mm. The mesh should be embedded in such a way that it cannot be seen after filling. After the mortar has dried (approx. 14 days depending on weather conditions), external plaster can be applied.

Temperature of performed work

Air temperature from + 5 ° C to +25 ° C. Substrate temperature from + 5 ° C to +25 ° C. Work in temperature between +5 ° C and +25 ° C. For a period of 7 days after the completion of works, the air temperature should not be below +5 ° C, and for the next 21 days should not fall below 0 ° C.

Expenditure

Bonding of foamed polystyrene boards approx. 4.0-5.0 kg per 1m², Embedding fiberglass mesh: 3.0-4.0 kg per 1m².

Packaging

Paper sacks: 25 kg Pallet: 54 25 kg bags = 1350 kg

Storage and transport

The products must be absolutely stored in undamaged packaging and dry rooms on pallets. Protect against soaking, moisture during storage and transport. The storage period of the product in conditions complying with the recommendations given is up to 12 months from the date of manufacture placed on the packaging in digital print. The date of production, which is placed on the packaging, is also the date of manufacture of the product. Any changes visible in the product or packaging structure without specialized tests, in particular discoloration or smudging of the packaging graphic, infringements of the packaging continuity, biological changes in the product structure, recognizable in particular as a consequence of moisture, may indicate poor storage or transport conditions and do not guarantee compliance declared product performance according to specifications.

Precautions

The product contains cement which, when mixed with water, gives an alkaline reaction. Take measures to prevent dusting or splashing with the mortar. Do not inhale, protect eyes and skin. In case of contamination: rinse eyes immediately with plenty of clean water and seek medical advice, wash skin with soap and water. Keep out of children's reach. If swallowed, seek medical advice immediately and show the container or label.

Do you have questions? Doubts? Ask an advisor Contact form